Menekse Res

Menekşe Renewable Energy and Electricity Generation Inc.

Licensed Menekşe Wind Power Plant is located within Menekşe Yenilenebilir Enerji ve Elektrik Üretim AŞ Menekşe WPP is planned to be established in Yozgat, Sorgun-Çekerek region in 2024 to generate electricity. It is planned to produce 70,000 MWh per year with a production capacity of 20 MWm on 177 acres of land. The targeted annual carbon emission amount of Menekşe WPP is 65,000 tons.

 

Numeric Data

CONSULTANCY

CONSULTANCY

Renewatt

TURBINE BRAND AND TYPE

TURBINE BRAND AND TYPE

Goldwind GW 165

TOWER SIZE

TOWER SIZE

100 m

WING DIAMETER

WING DIAMETER

165 m

CARBON EMISSIONS

CARBON EMISSIONS

45,360 tons/year

Teknik Veriler

LOCATION

LOCATION

Yozgat – Sorgun - Çekerek ve Araplı Köyleri

LICENSE DURATION

LICENSE DURATION

Mayıs 2023’den itibaren 49 yıl

LAND SIZE

LAND SIZE

177 dönüm

PRODUCTION AMOUNT - MWh / YEAR

PRODUCTION AMOUNT - MWh / YEAR

70,000,000 kWh/year

MWe (AC) / MWm (DC) POWER

MWe (AC) / MWm (DC) POWER

20 MWe / 24 MWm

ENERGIZED HOUSING

ENERGIZED HOUSING

30,000 pieces

Menekse Res